Manual
Drawing : - TPC 392
Issue : - 12
Date : - 21/08/20
INSTALLATION
The DD1200 is designed for indoor use. The unit should be placed on a level
surface and a space of 1 meter free around all faces to allow access for any
duct work and servicing.
Connecting duct work:
The regeneration outlet must be ducted to outside the area being
dehumidified. The outlet duct spigot is 6” diameter and only 6” ducting or
greater should be attached.
The process outlet can be ducted to a specific area or another room. The
outlet duct spigot is 8” diameter and only 8” ducting or greater should be
attached.
Power Supply & Humidistat Control:
The unit must be connected to a suitable 220V, 3 phase, 60Hz supply.
Feed power cables through the gland provided and then wire the unit as
shown below.
An external humidistat can also be used to control the relative humidity in the
dehumidified area. If a humidistat is used then the wires should pass through
the gland provided and then wired as shown in the diagram at the back of this
manual.
-
WARNING
-
THIS APPLIANCE MUST BE EARTHED