Manual
Page 5 of 12
Drawing : - TPC249
Issue : - 7
Date : - 10/12/13
OPERATION
The following procedures should be followed to test the CD60 for correct
operation:
1. After unpacking, examine all external features to confirm damage-
free shipment. Report all defects and damage at once. Connect the
power cable to a grounded 15 Amp electrical outlet.
2. Check dehumidification process as follows:
A. Place unit on a level surface.
B. Start up unit by switching to “ON”.
C. Check that the compressor is running.
D. Leave the machine running for 15 minutes.
E. Observe the evaporator coils through the rear upper grill, to
confirm frost operation.
i. If the air temperature is below 80° F, an even coating of
frost should cover the entire evaporator coil
ii. If the air temperature is above 80° F, frost and/or droplets
of condensed water should cover the entire
evaporator coil.
F. After continuous running time of approximately 55 minutes, the
unit will enter “Hot Gas” defrost mode for several minutes and
then automatically return to normal operation.
If, after carrying out the above procedures, the unit does not appear to
function properly, refer to the Trouble Shooting section, which follows,
or contact the Factory Service Center.
CAUTION:
DO NOT REMOVE COVERS WHEN UNIT IS IN OPERATION
CAUTION:
ONCE THE UNIT HAS BEEN SWITCHED OFF, WAIT AT
LEAST FIVE MINUTES BEFORE RESTARTING.