Manual
Page 6 of 16
Drawing : - TPC250
Issue : - 6
Date : - 10/12/13
SYSTEM INSTALLATION
POSITIONING:
Position the CD425 in the area leaving enough room at either end of the unit
to allow for easy servicing. Using a spirit level ensure the level in both
directions. Failure to do so may result in the drain tray overflowing and
flooding of the chamber.
WIRING:
Connect a suitable 3 phase mains power supply to the MAINS T/B terminal
block inside the electric box located at the control panel end of the machine.
DRAINAGE:
Connect the outlet from the drain tray (located behind the front grille and
under the evaporator coils) to a permanent drain.
Please ensure that the drainage does not rise above the level of the CD425’s
drain tray. Failure to observe this requirement will result in internal flooding of
the dehumidifier.