Instruction manual

INTUITY Messaging Solutions Release 4
MAP/5P Maintenance
585-310-186
Issue 3
October 1997
Diagnostics
Page 2-48Conducting Diagnostics
2
Figure 2-41. Busyout Command Output Window
Switch Integration Link Release Procedure
Releasing the switch link puts the link back in service so that it can accept and
process data.
To release the switch link, do the following:
1. Starting at the Lucent I
NTUITY Main menu (Figure 2-1), select
The system displays the Diagnose Switch Link window (Figure 2-38
).
2. Press (Chg-Keys).
3. Press (Release).
The system displays Release Command Output window (Figure 2-42
).
> Switch Interface Diagnostics
>
Diagnostics
> Customer/Services Administration
F8
F3