Installation & Assembly

Assembly instruction
Eichholtz B.V.
Delfweg 52
2211 VN Noordwijkerhout
The Netherlands
www.eichholtz.com
service@eichholtz.com
+31 (0)252 515 850
Item type
Chandelier
Item name
Clinton
Item no
113481
Attention! Turn off the electricity supply at the main circuit
panel before installing. Do not connect the electricity supply
until your luminaire is fully assembled and installed.
Care instructions:
Wipe with a soft dry cloth, do not use chemicals or abrasive
cleaning materials.
3. Carefully place the canopy over the ceiling plate and fix the canopy with
the nuts provided.
2. Connect the 3 wires according to their colours. Brown is the live wire,
blue is the neutral wire, green/yellow is the earth wire.
1. Fix the ceiling plate to the wall by using ceiling mounting plugs and
screws suitable for your ceiling type.
N
L

Summary of content (1 pages)