User manual

Mounting Instructions
Page 40
2. Attach the off-heat tube.
3. Take measurements to determine
where to saw the duct opening.
The duct opening should have a
diameter of 10 cm.
INFO:
Ensure that there are no kinks in
the flexible off-heat tube and use a
second pipe bend (bow) if
necessary (optional accessory).
When drilling into spaces, please
ensure that no cables are located in
these spaces.
Please also take particular care to
ensure that you do not cut through
any load-bearing parts of the
vehicle. For more information,
contact your vehicle manufacturer.
1 cm
4. Remove the red protective cap from
the exhaust gas outlet of the EFOY fuel
cell.
5. Attach the straight end of the exhaust
hose supplied to the exhaust gas
outlet.
6. Take measurements to determine
where to saw the duct opening.
The duct opening should consist of a
hole with a 1 cm diameter.
7. Remove the device while drilling and
sawing to keep it clean.
8. Saw a hole as a duct opening for the
off-heat tube.
9. Drill a hole for the waste hose.
English