User Guide
Revision: 0 Date: 2003.09.01 (Manufacturing Section): PE
Difference Operating Item
Part name/specification Part/number Q'TY Operation description Important note
Jig/fixture
1
D212A-#8028 UPPER COVER KIT
77-636007-00 1 Assemble upper cover kit on base foundation.
When assembling UPPER COVER,
the RIB must be fixed in the proper
position.
NA
2
NA
NA 1 Check the upper cover; do not cover 5 LED lights. NA NA
NA
Attach it vertically above red line as
shown in diagram.
4
CONDUCTIVE SPONGE
(10X0.5X45mm)
51-350094-15 1
PAGE: 10
Explanation of illustration
Name of S.O.P﹕efio!121A System Ass'y SOP
Working name: 7055
341-850520-06SCREW ISOP M2.0 X 6.0L3
Attach conductive sponge to upper cover left upper
corner as shown in diagram.
Do not touch UPPER COVER's iron
plate; if there is dirt, use cleanser to
remove.
( Twinhead S.O.P ) (Document NO) : TESOP260
Electrical screwdriver/Torque:
1.5±0.5Kgf-cm
Tighten 2 screws on upper cover in a order a.b c as
shown in diagram.
4
a
b
c
3
Twinhead International Corp.
2
The UPPER COVER's rib
must be attached to base rib's
left side.
1
Attach conductive
sponge stick along
this red line.










