User Guide

Slide the insulation over the cold feed line.
Slide the insulation over the hot feed line.
*Option: Can route thermocouple lead with either hot
or cold feed line.
Insert the cold feed line into the cold process fitting.
Insert the hot feed line into the hot process fitting.
2
Connect Thermocouple
4
Attach Temp. Control Feed Lines
5
Plug the K-type thermocouple lead into the back panel
of the ProcessMate.
Connect the other end of the lead to process hardware.
*Option: Can route lead with either air line tubing inside insulation.
See Step 5.
NOTE: Longer Thermocouple leads may be used when required.
These are available from a variety of sources in many lengths.
Only K-Type thermocouple leads should be used with the ProcessMate.
Using a different type will result in incorrect temperatures.
NOTE: Clean, dry, filtered factory air is necessary to meet warranty requirements.
If your air supply is not filtered, order the EFD five-micron filter regulator
(EFD part# 2000F755).
Push one end of the air input hose into the input fitting
on the back of the ProcessMate.
Connect the other end of the hose to your plant air supply.
Set plant air supply within 80 to 100 psi (5.5 to 6.9 bar).
DO NOT exceed 110 psi (7.5 bar) or damage to the unit may occur.
Connect Air Input
3