Owner Manual
Table Of Contents
Page 3
04/2019
Maintenance
For additional information, please call Customer Relations at 800.451.1250 or visit efcontractflooring.com.
III.
Interim Maintenance
Low Moisture Encapsulation Cleaning
Entrances, heavy traffic areas, food and beverage areas and corridors should be properly cleaned at regular scheduled intervals.
Whittaker’s LOMAC
®
Encapsulate System is highly effective toward maintaining Kinetex appearance. This interim maintenance
system features quick dry times and high productivity levels. This provides for the space to be returned to service quickly. These
systems are also excellent for routine spot cleaning and scuff mark removal.
NOTE: DO NOT USE DRY COMPOUND CHEMISTRY WITH KINETEX. SPIN BONNET VOIDS WARRANTY.
IV.
Restorative Maintenance
The final part of a soft surface flooring maintenance system is deep cleaning using hot water extraction (HWE). This method of
deep cleaning equipment may be either truck mounted or portable. Brands are Bane Clene, Tenant, US Products or any machine
which has earned the CRI Seal of Approval.
Begin the preparation process by first thoroughly vacuuming, followed by an application of an extraction pre-spray, allow for
specified dwell time, extract. For heavy soiling, agitate applied pre-spray onto the Kinetex prior to wet extraction.
o Air movers will greatly reduce dry times.
o HVAC should be in constant operation.
NOTE: DO NOT USE DRY COMPOUND CHEMISTRY WITH KINETEX.
Frequency Chart
Traffic/Soil
Light
Moderate
Heavy
Vacuum One to three times weekly Daily One to three times daily
Spot Check/Clean Daily Daily Daily
Interim Maintenance Every 3--- 6 months Every three months Monthly
Restorative Maintenance Annually Every six months Every 90 days