Installation & Assembly

STAIRS - Use single or double undercut stair nosing and cut tiles to fit nosing, both step and riser. Use full spread adhesive under modules.
FINISHED INSTALLATION - Roll entire job with 75-100 lb. roller after completion of installation.
LOOP PILE CONSTRUCTION--Carpet modules with loop pile constructions may experience yarn blossoming at the edges, which is consistent with this type of construction.
Clipping or shearing the yarn edges can remedy this condition.
REPLACEMENT TILES - On occasion, it may be necessary to replace damaged or heavily soiled modules. Modules can be replaced with new modules from onsite inventory
or from another area of the installation. A difference of appearance may be noticed when modules are replaced; this difference usually diminishes in a short time.
T
he procedures listed above are our best recommendations for installing Nexus Modular Carpets. If you have further questions or require additional information please contact:
For J+J Flooring Group products: J+J Flooring Group Customer Relations Department at 800-241-4586 For
EF Contract products: EF Contract Customer Relations Department at 800-451-1250 For Pentz products:
Pentz Technical Service at 866-706-9745 x8407 or email pentztechservice@engineeredfloors.com
efcontractflooring.com 04/2019