User's Manual
Quick Start Guide
– 2 –
Follow the steps in this guide to install the AP in your network.
Caution:
The planning and installation of the AP requires professional personnel
that are trained in the installation of radio transmitting equipment. The user is
responsible for compliance with local regulations concerning items such as
antenna power, use of lightning arrestors, grounding, and radio mast or tower
construction. Therefore, it is recommended to consult a professional contractor
knowledgeable in local radio regulations prior to equipment installation.
1. Unpack the AP Unpack the AP and check the package contents.
◆ SMC2890W-AN or SMC2891W-AN Outdoor Access Point
◆ Bracket Mounting Kit for pole mounting
◆ PoE power injector with power cord—either US, Continental Europe or UK
◆ Console cable (RJ-45 to DB-9)
◆ Waterproof RJ-45 port cover
◆ Quick Start Guide
◆ Regulatory and Safety Information
◆ Documentation CD — includes Installation Guide and Management Guide
2. Mount the AP After planning your installation, mount the unit on a pole, mast, or tower using the
mounting bracket. Also install the external antennas required for your wireless
service.
.
Pole Mounting
Attach one part of the bracket to the AP.
Attach the other parts of the bracket to
the pole.
Link the two bracket parts together to
secure the AP to the pole.
1
2
3
1
2
3