RPS600WA-38 Manual
Installing the Redundant Power Supply
2-2
2
Equipment Checklist
After unpacking the RPS, check the contents to be sure you have received all the
components. Then, before beginning the installation, be sure you have all other
necessary installation equipment.
Package Contents
• Redundant Power Supply Unit
• One AC Supply Power Cord — US, Continental Europe or UK
• Four DC Backup Power Cords with IEC connectors on both ends (length 152 cm
each)
• Rack Mounting Kit containing brackets and screws
• Adhesive feet
• Registration Card
Optional Rack-Mounting Equipment
If you plan to rack-mount the RPS, be sure to have the following equipment
available:
• Four mounting screws for each device you plan to install in a rack—these are not
included
• A screwdriver (Phillips or flathead, depending on the type of screws used)
Mounting
RPS units can be mounted in a standard 19-inch equipment rack or on a desktop or
shelf. Mounting instructions for each type of site follow.
Rack Mounting
Before rack mounting the unit, pay particular attention to the following factors:
• Temperature: Since the temperature within a rack assembly may be higher than
the ambient room temperature, check that the rack-environment temperature is
within the specified operating temperature range.
• Mechanical Loading: Do not place any equipment on top of a rack-mounted unit.
• Circuit Overloading: Be sure that the supply circuit to the rack assembly is not
overloaded.
• Grounding: Rack-mounted equipment should be properly grounded. Particular
attention should be given to supply connections other than direct connections to
the mains.