ES3528MV2 DC_Installation Guide-R03

C
HAPTER
2
| Installing the Switch
Equipment Checklist
– 35 –
EQUIPMENT CHECKLIST
After unpacking the switch, check the contents to be sure you have received all
the components. Then, before beginning the installation, be sure you have all
other necessary installation equipment.
PACKAGE CONTENTS
ES3528MV2 Fast Ethernet Switch
Four adhesive foot pads
Bracket Mounting Kit containing two brackets and eight screws for attaching
the brackets to the switch
Power Cord
RS-232 console cable
This Installation Guide
Management Guide CD
OPTIONAL RACK-MOUNTING EQUIPMENT
If you plan to rack-mount the switch, be sure to have the following equipment
available:
Four mounting screws for each device you plan to install in a rack—these
are not included
A screwdriver (Phillips or flathead, depending on the type of screws used)