ES3528MV2 DC_Installation Guide-R03
Table Of Contents
- Front Cover
- Compliances and Safety Statements
- About This Guide
- Contents
- Tables
- Figures
- Introduction
- Installing the Switch
- Making Network Connections
- Troubleshooting
- Cables
- Specifications
- Glossary
- Index
- Back Cover
– 23 –
FIGURES
Figure 1: Front and Rear Panels 25
Figure 2: Port Status LEDs 27
Figure 3: System Status LED 28
Figure 4: AC Power Supply Socket 29
Figure 5: DC Power Supply Socket 29
Figure 6: Network Aggregation Plan 31
Figure 7: Remote Connections with Fiber Cable 32
Figure 8: RJ-45 Connections 34
Figure 9: Attaching the Brackets 37
Figure 10: Installing the Switch in a Rack 37
Figure 11: Attaching the Adhesive Feet 38
Figure 12: Inserting an SFP Transceiver into a Slot 39
Figure 13: DC Plug Connections 41
Figure 14: DC Power Socket 42
Figure 15: AC Power Socket 42
Figure 16: Serial Port (DB-9 DTE) Pin-Out 43
Figure 17: Making Twisted-Pair Connections 46
Figure 18: Network Wiring Connections 47
Figure 19: Making Fiber Port Connections 49
Figure 20: RJ-45 Connector Pin Numbers 55
Figure 21: Straight-through Wiring 57
Figure 22: Crossover Wiring 57