Installation Guide

Table Of Contents
C
HAPTER
2
| Installing the Switch
Equipment Checklist
– 33 –
EQUIPMENT CHECKLIST
After unpacking this switch, check the contents to be sure you have received all
the components. Then, before beginning the installation, be sure you have all
other necessary installation equipment.
PACKAGE CONTENTS
Gigabit Ethernet Switch (ECS4810-12M)
Four adhesive foot pads
Power Cord
Bracket Mounting Kit containing two brackets and eight screws for attaching
the brackets to the switch
Console cable (RJ-45 to DB-9)
This Installation Guide
Management Guide CD
OPTIONAL RACK-MOUNTING EQUIPMENT
If you plan to rack-mount the switches, be sure to have the following
equipmentavailable:
Four mounting screws for each device you plan to install in a rack—these
are not included
A screwdriver (Phillips or flathead, depending on the type of screws used)