ECS4210-12T_Installation Guide

Chapter 2
| Installation Overview
Switch Installation Tasks
– 18 –
As connections are made, check the port status LEDs to be sure the links are valid.
Go to the chapter “Port Connections”
Figure 8: Making a Connection to an SFP Port
Install SFP transceivers. Connect fiber optic cabling to the ports.
1
2
1
2