ECS4110-28T_Installation Guide-R03
Table Of Contents
- How to Use This Guide
- Contents
- Figures
- Tables
- Switch Description
- Installation Overview
- Switch Chassis
- Power and Grounding
- Port Connections
- Switch Management
- Troubleshooting
- Index
Chapter 2
| Installation Overview
Switch Installation Tasks
– 18 –
For information on initial switch configuration:
Refer to the Management Guide.
Install Transceivers and Connect Cables
Install SFP transceivers and connect network cables to port interfaces:
◆ For RJ-45 ports, use 100-ohm category 3 or better ethernet cable for 10BASE-T
connections, use 100-ohm category 5 or better ethernet cable for 100BASE-TX
and 1000BASE-T connections.
◆ Install SFP transceivers and then connect fiber optic cabling to the transceiver
ports.
As connections are made, check the port status LEDs to be sure the links are valid.
Go to the chapter “Port Connections”
Figure 7: Making a Connection to an SFP Port
Task 6
Install SFP transceivers. Connect fiber optic cabling to the ports.
1
2
1
2