ECS4110-28T_Installation Guide-R03
Table Of Contents
- How to Use This Guide
- Contents
- Figures
- Tables
- Switch Description
- Installation Overview
- Switch Chassis
- Power and Grounding
- Port Connections
- Switch Management
- Troubleshooting
- Index
Chapter 2
| Installation Overview
Switch Installation Tasks
– 16 –
Connect AC Power to Power On
Connect the power cord to the AC socket on the switch and to a grounded, 3-pin,
AC power source.
Go to the chapter “Power and Grounding”
Figure 4: Connecting AC Power
Verify Switch Operation
Verify basic switch operation by checking the system LEDs.
When operating normally, the PWR and DIAG LEDs should both be on green. If any
of the LEDs are on amber, see “Diagnosing LED Indicators” on page 43.
Go to the section “Understanding the System Status LEDs” on page 39
Task 3
Connect an external AC power source
to the AC power socket of the switch
using the supplied AC power cord.
Supplied AC Power cord.
1
2
1
2
Task 4