Connect Power
1. Install two universal AC power supply units (PSUs) in the switch.
2. Connect an external AC power source to the PSUs.
Verify Basic Switch Operation
1. Verify basic switch operation by checking the SYS LED.
2. When operating normally, the SYS LED should be on green.
Connect Network Cables
1. Connect a 100-ohm Category 5e (or better) twisted-pair cable
to the 1000BASE-T RJ-45 Management port.
2. Connect network cables to QSFP28 interfaces:
◆
If you are connecting fiber optic cables, install QSFP28 fiber
transceivers and then connect fiber optic cabling to the
transceiver ports.
The following transceivers are supported:
◆
CLR4 100G
◆
LR4/LR4-lite 100G
◆
CWDM4 100G
◆
OpenOptic 100G
◆
If you are using twinax copper cables (DAC cables) for port
connections, connect the QSFP28 transceivers on the end of
the DAC cables directly into the QSFP28 slots.
The QSFP28 ports can be configured as single-lane 100G
mode, dual-lane 50G mode, single-lane 40G mode, four-
lane 25G mode, or four-lane 10G mode. The following cable
types are supported:
◆
100 GbE to QSFP28 100 GbE cable: 1 m, 2 m, and 3 m
◆
100 GbE to 2xQSFP28 50 GbE split cable (Y-cable): 1 m,
2 m, and 3 m
◆
100 GbE to 4xSFP28 25 GbE fanout cable: 1 m, 2 m, and
3 m
Caution:
Use the AC power cord supplied with the switch. For
International use, you may need to change the AC line cord.
You must use line cord sets that have been approved for the
socket type in your country.
Attention:
Utilisez le cordon d’alimentation secteur fourni
avec le commutateur. Pour une utilisation internationale,
vous devrez peut-être changer le cordon d'alimentation.
Vous devez utiliser des jeux de cordons d’alimentation
approuvés pour le type de prise de votre pays.
3
1
2
4
1
1
5
2