(AS7816-64X) Quick Start Guide R04

Quick Start Guide
– 2 –
2. Attach a #10 AWG grounding wire (not included) to the
grounding point on the switch rear panel. Then connect the
other end of the wire to rack ground.
Connect Power
1. Install one or two AC or DC PSUs in the switch.
The switch supports up to two PSUs that must have the same
matching airflow direction as the installed fan trays.
2. Connect an external AC or DC power source to the PSUs.
1. Connect the RTN return. (red wire).
2. Connect the -36 – -72 VDC (black wire).
3. Connect the Chassis Ground (yellow-green wire).
Verify Switch Operation
1. Verify basic switch operation by checking the system LEDs.
When operating normally, the PSU1/PSU2, Diag, and Fan LEDs
should all be on green.
Perform Initial System Boot
1. If the network operating system (NOS) installer is located on a
network server, first connect the RJ-45 Management (Mgmt) port
to the network using 100-ohm Category 5, 5e or better twisted-
pair cable. (Not required if the NOS installer is located on
attached storage.)
2. Boot the switch. Wait for the ONIE software to locate and
execute the NOS installer, and then wait for the installer to load
the NOS software image.
Subsequent switch boots will bypass ONIE and directly run the
NOS software.
Connect Network Cables
1. For the RJ-45 Management port, connect 100-ohm Category 5,
5e or better twisted-pair cable.
2. Connect DAC cables to the QSFP28 slots. Or first install
QSFP28 transceivers and then connect fiber optic cabling to the
transceiver ports.
The following transceivers are supported:
100GBASE-CR4, AOC, SR4, LR4, and PSM4
40GBASE-CR4, SR4, and LR4
Caution:
The earth connection must not be removed unless
all supply connections have been disconnected.
Attention:
Le raccordement à la terre ne doit pas être retiré
sauf si toutes les connexions d’alimentation ont été
débranchées.
Caution:
Use a UL/IEC/EN 60950-1 certified power
supply to connect to a DC converter, and a #10 AWG (for -
36 VDC to -72 VDC PSU) wire to connect to a DC PSU.
Attention
: Utilisez une alimentation certifiée UL/IEC/EN
60950-1 pour le connecter à un convertisseur CC et un
câble AWG #10 (pour -36 VDC à -72 VDC) pour vous
connecter à une alimentation CC.
4
1
2
1
2
3
Note:
For switches with ONIE software pre-loaded, refer to
the network operating system (NOS) installer and NOS
documentation for details on software options and set up for
ONIE.