Quick Start Guide R08
– 2 –
Attach the grounding wire #14 AWG to the grounding point
on the switch rear panel. Then connect the other end of the
wire to rack ground. For details on grounding the switch
with a 12 VDC PSU in an Open Rack, refer to the Edgecore
ORSA-1U Open Rack Tray Set Installation Guide.
Caution:
The earth connection must not be removed
unless all supply connections have been disconnected.
Attention:
Le raccordement à la terre ne doit pas être retiré
sauf si toutes les connexions d’alimentation ont été
débranchées.
5. Connect Power
Install one or two AC or DC power modules in the switch.
The switch supports up to two PSUs that must have the
same matching airflow direction as the installed fan tray.
Connect an external AC or DC power source to the modules.
36 – 75 VDC Return (blue
wire)
Chassis Ground (yellow-
green wire)
-36
– -75 VDC (brown
wire)
Open Rack tray connector
for 12 VDC PSU
Caution:
Use a UL/IEC/EN 60950-1 certified power supply
to connect to a DC converter, and a #14 AWG (for 36–75 VDC
PSU) or #10 AWG (for 12 VDC PSU) wire to connect to a DC
PSU.
Attention:
Utilisez une alimentation certifiée UL/IEC/EN
60950-1 pour le connecter à un convertisseur CC et un câble
AWG #14 (pour 36 VDC à 75 VDC) pour vous connecter à une
alimentation CC.
2
2
1
1
2
3
2
1
4
1
3
2
4
6. Verify Switch Operation
Verify basic switch operation by checking the system LEDs.
When operating normally, the PSU1/PSU2 and Fan LEDs
should all be on green.
7. Perform Initial System Boot
If the network operating system (NOS) installer is located on
a network server, first connect the RJ-45 Management
(Mgmt) port to the network using 100-ohm Category 5, 5e
or better twisted-pair cable. (Not required if the NOS
installer is located on attached storage.)
Boot the switch. Wait for the ONIE software to locate and
execute the NOS installer, and then wait for the installer to
load the NOS software image.
Subsequent switch boots will bypass ONIE and directly run
the NOS software.
Note:
For switches with ONIE software pre-loaded, refer to
the network operating system (NOS) installer and NOS
documentation for details on software options and set up
for ONIE.
8. Connect Network Cables
For the RJ-45 Management port, connect 100-ohm Category
5, 5e or better twisted-pair cable.
Connect DAC cables to the SFP+/QSFP+ slots. Or first install
SFP+/QSFP+ transceivers and then connect fiber optic
cabling to the transceiver ports.
The following transceivers are supported:
◆
40GBASE-CR4
◆
40GBASE-SR4
◆
10GBASE-CR
◆
10GBASE-SR (ET5402-SR)
◆
1000BASE-SX (ET4201-SX)
◆
1000BASE-LX (ET4201-LX)
Note:
As connections are made, check the port status LEDs
to be sure the links are valid.
1
1
1
2
2
1
1
2
Quick Start Guide