Owner manual
Installation Instructions for Angle and Kurve Display Sign
w/4SQ Canopy
Installation Setup
1718 W. Fullerton Ave
Chicago, IL 60614
Tel: 773-770-1195
Fax: 773-935-5613
www.edgelighting.com
info@edgelighting.com
© 2013 Edge Lighting. All Rights Reserved.
SAVE THESE INSTRUCTIONS!
- This instruction shows a typical installation.
IMPORTANT INFORMATION
1
hinge. Typically, the most left hinge contains the power
wires.
: Measure the distance from center of each hinge to the other
904-KAD-4SQ-01
A
1
KD-7WDC-4SQ-_
MEASURE
CHANNEL
B
2: The hinge containing power wires should be aligned with
the center of the junction box. Starting from the center of
the electrical box, mark all measured point(s) onto the wall
ensuring the marked points are leveled horizontally with the
center of the junction box.
CHANNEL
HINGE
1
ANCHOR FOR
STANDOFF POST
WALL
1:
2: Tap the anchors to the new marked holes with a hammer up
to the threaded portion
For each base, mark additional points at 0.6" to the top and
bottom of the previously marked points.
3: Screw in the threaded portion of the anchor(s) with a Phillips
screwdriver.
C
0.6"
APART
1
3
2
SIDE VIEW
NOTE: The base holes should be in a vertical position at 90°
angle to the direction of the fixture.
HINGE
MARKED
POINT
0.6"
APART
AD-7WDC-4SQ-_
MEASUREMENTS
FROM STEP 1
2
2
J-BOX CENTER LINE
WALL
4: Mount each base to the anchors with two provided #8
screws.
Install Fixture
#8 SCREW
ANCHOR
D
- This product is powered with a 24 volt DC power supply
such as PSB-96W-010-24VDC.
NOTE: Depending on fixture length, the fixture is provided with 2
to 4 hinges.