Installation guide
xii
Figures
Figure 1-1. Front and Rear Panels 1-1
Figure 1-2. Port Status LEDs 1-3
Figure 1-3. System Status LED 1-4
Figure 1-4. Power Supply Sockets 1-4
Figure 2-1. Collapsed Backbone 2-2
Figure 2-2. Network Aggregation Plan 2-3
Figure 2-3. Remote Connection with Fiber Cable 2-4
Figure 2-4. Making VLAN Connections 2-5
Figure 3-1. RJ-45 Connections 3-2
Figure 3-2. Attaching the Brackets 3-3
Figure 3-3. Installing the Switch in a Rack 3-4
Figure 3-4. Attaching the Adhesive Feet 3-4
Figure 3-5. Inserting an SFP Transceiver into a Slot 3-5
Figure 3-6. Power Sockets 3-6
Figure 3-7. Serial Port (DB-9 DTE) Pin-Out 3-7
Figure 4-1. Making Twisted-Pair Connections 4-1
Figure 4-2. Network Wiring Connections 4-2
Figure 4-3. Making Fiber Port Connections 4-3
Figure B-1. RJ-45 Connector Pin Numbers B-1
Figure B-2. Straight-through Wiring B-2
Figure B-3. Crossover Wiring B-3