Installation manual
©2014 Edelbrock LLC
Part #1596, 1597, 1598, 1599
Brochure #63-1598
Rev. 9/19/14 - QT/mc
Edelbrock E-Force Supercharger System
2010-2014 Camaro SS
Installation Instructions
Page 15
71. Install the supplied Heater Core Hose Assembly to the
firewall fittings using the supplied hose clamps. Route the
lines between the engine oil dipstick and the fuse box to the
fittings on the water pump and secure them with the
supplied hose clamps. Note that the hose closer to the
passenger side of the firewall will be routed to the fitting
closer to the front of the vehicle and vice versa.
72. Apply Blue Loctite, or equivalent, to the threads of the
M8 x 20mm bolt supplied in Bag #1 then use a 12mm
socket and washer to install the smaller supplied idler pulley
onto the supplied idler bracket.
73. Use a 10mm socket to remove the three water pump
bolts indicated.
74. Apply blue Loctite, or equivalent, to the threads of the
M8 x 100mm bolts supplied in Bag #1 then use a 6mm
Allen tool to install the idler bracket onto the water pump.
75. Use a 15mm socket to remove the nut retaining the
ground strap on the passenger side cylinder head then use
a 15mm deep socket to remove the ground strap stud.
76. Apply blue Loctite, or equivalent, to the threads of the
stock tensioner bolts then use a 15mm socket to install the
supplied tensioner bracket to the water pump.
77. Apply blue Loctite, or equivalent, to the threads of the
M10 x 65mm bolt supplied in Bag #1 then use an 8mm
allen to install it in the countersunk bolt hole of the tensioner
bracket.