Installation manual
©2014 Edelbrock LLC
Part #1596, 1597, 1598, 1599
Brochure #63-1598
Rev. 9/19/14 - QT/mc
Edelbrock E-Force Supercharger System 
2010-2014 Camaro SS
Installation Instructions
Page 8
Supercharger Installation
NOTE: It is very important to perform the PCM flashing 
procedure prior to starting this installation. This will 
prevent any major installation delays due to non-compatible 
calibration files.
In the rare occurrence that you encounter an error message 
during the PCM flashing procedure, please refer to Page 28, 
titled E-mail Edelbrock Your Stock PCM Calibration.
WARNING: Battery must be sufficiently charged before 
starting the PCM flashing procedure.
Only begin the PCM flashing procedure when you are 
ready to install the supercharger. Once the PCM is 
flashed, DO NOT START the engine until the installation 
of the E-Force supercharger is complete.
1.  Before starting the flash procedure, check the 
Edelbrock website at:
(http://www.edelbrock.com/automotive/mc/
superchargers/support.shtml) 
to confirm that you have the latest calibration file. Once 
you have found the latest calibration file on the website, 
power on the programmer. Press the left arrow and select 
the “Device Info” option. Scroll down to “Tune Version” 
and compare the tune number to the one on the website.  
If they are different, download the new calibration file with 
the supplied USB cable.
2.  Put the car into ACC mode, but don’t start the vehicle.
3.  Connect the supplied PCM cable on the handheld 
programmer to the OBD-II connector located below the 
steering wheel, and to the left of your knee.
4.  Use the directional pad to highlight the Program 
Vehicle option and press the Select button. 
5.  Use the directional pad to highlight the Pre-programmed 
Tune option and press the Select button.
6.  Read the disclaimer then press Select to continue.
7.  Verify that the ignition is in the ‘Key On’ position and  
that the engine is not running, then press Select.
8.  Use the directional pad to highlight your vehicle and 
transmission combination then press Select.
9.  Use the directional pad to highlight the Begin Program 
option then press Select.
10.  Depending on your specific drivetrain configuration, 
several separate operations may take place during this 
step. Completion of each operation will cause the progress 
bar to reset to zero.
11.  DO NOT unplug the programmer until prompted.
12.  Turn the vehicle off when prompted to do so by the 
handheld programmer.
13.  Read the parting message from programmer then 
press Select to continue.
14.  Unplug the programmer cable from the OBD-II port.  
This concludes the PCM flashing procedure. DO NOT start 
the engine until the supercharger installation is complete.
15. Open trunk and lift trunk liner to access plastic hold 
down. Unscrew plastic hold down then remove air 
compressor and foam support.
16. Use a 10mm socket to loosen and remove the negative 
battery terminal. 










