Owners manual

©2017 Edelbrock LLC
Brochure #63-1570
Rev. 5/17/17 - NP
Edelbrock E-Force Supercharger System
2014-2017 Chevy Corvette C7 LT1 6.2L
Installation Instructions
Page 31
119. Using the supplied 3/8” hose, the factor brake booster
check valves and fittings, assemble the new brake booster
hose according to the diagram below. Note that the check
valves are directional as illustrated by the white arrows.
6”
4”
2”
16”
120. Connect the new brake booster hose assembly to the
brake booster and canister. Route the 16” end towards the
nose of the supercharger and connect it to the lower barb
on the throttle body flange. Reconnect the brake booster
harness connector and secure hose assembly away from
moving and hot components.
121. Install the rubber bumpers from Bag #2 onto the
recovery tank as shown.
122. Using a 10mm socket and three (3) M6 x 10mm bolts
from Bag #2, secure the recovery tank bracket and the relay
on the supplied water pump harness to the recovery tank.
123. Using a panel puller, remove the christmas tree clips
securing the engine harness next to the brake control
module. Using a 10mm socket, remove the bolt securing
the ground strap from the same engine harness.
124. Using a 10mm socket and the factory ground strap
bolt, secure the recovery tank assembly along with the
factory ground and the ground strap on the water pump
harness, to the factory ground location. Using a 10mm
socket and a M6 x 16mm bolt from Bag #2, secure the
recovery tank to the christmas tree location from the
previous step.