Owners manual
©2017 Edelbrock LLC
Brochure #63-1570
Rev. 5/17/17 - NP
Edelbrock E-Force Supercharger System
2014-2017 Chevy Corvette C7 LT1 6.2L
Installation Instructions
Page 26
77. Using a 24mm socket and a torque wrench, install the
used factory balancer bolt and torque it to 240 ft-lbs. Then
remove the factory balancer bolt and discard.
NOTE: The nose of the crankshaft should be recessed
2.4–4.48 mm (0.094–0.176”in) into the balancer bore.
Measure for a correctly installed balancer. If the balancer
is not installed to the proper dimensions, repeat the
installation procedure until the proper dimensions are
achieved.
78. Using a 24mm socket and a torque wrench, install
the new supplied balancer bolt and torque it to 110 ft-lbs.
Loosen the bolt 360° and re-torque the bolt to 59 ft-lbs. +
an additional 200° of rotation.
79. Install the supplied balancer pulley onto the balancer.
Apply Blue thread locker to the three (3) M10 x 25mm SHCS
bolts from Bag #1. Using an 8mm Hex key, secure the
balancer pulley to the balancer. Torque bolts to 18 ft-lbs.
80. Using the diagram below, reinstall the factory drive belt
to the 6 rib portion of the crank pulley.
81. Using a 13mm socket, remove three (3) bolts from the
factory water pump. Note that 2015 model years will have
a slightly different water pump.
2014 Model Year
2015 Model Year
82. Apply Blue thread locker to the three (3) M8 x 100mm
SHCS bolts from Bag #1. Using a 6mm Hex key, install the
FEAD bracket to the water pump. Torque bolts to 22 ft-lbs.
NOTE: 2015 model years, use the supplied shims from
Bag #1 in between the water pump provisions and the
FEAD bracket.
83. Insert the supplied pulley adapters to the backside of
the supplied grooved and smooth idler pulleys.