Owners manual

©2017 Edelbrock LLC
Part #1565, 1566, 1519, 15192
Brochure #63-1565
Rev. 5/17/17 - NP
Edelbrock E-Force Supercharger System
2014-2017 GM Truck & SUV 1500
5.3L and 6.2L Installation Instructions
Page 27
119. Secure the water pump harness to existing wire looms
and/or hoses away from moving components and sharp
edges.
120. Install the supplied grommets and Quick Disconnect
fittings from Bag #4 onto the supplied air inlet tube.
121. Install the hump coupler onto the airbox. Install the air
inlet tube onto the airbox and then onto the throttle body
using the straight coupler (6.2L) or the reducer coupler
(5.3L). Secure air inlet tube with the supplied worm
clamps.
122. Install the 90° end of the supplied PCV hose to the
passenger side valve cover. Install the other end to the
fitting on the air inlet tube.
123. Install the 45° end of the supplied PCV hose to the
driver side valve cover. Install the 90° end to the fitting on
the air inlet tube.
124. Fill the supercharger recovery tank with 50/50 coolant
blend. See “How to prime the Edelbrock E-Force intercooler
system guide at the end of these instructions.
125. Reconnect the battery and switch ignition to the ON
position, DO NOT START. With the ignition switch on,
check for any coolant or fuel leaks. Repair all leaks before
proceeding. If no leaks are present the installation is
complete.
Congratulations on the successful installation of your new
Edelbrock E-Force Supercharger System. If you have any
questions, please call our Technical Support hotline at 800-
416-8628 and one of our technicians will be happy to assist
you.