Manual
E-SECNG-I-0714
9
301-638-3326 • edcoinc.com • sales@edcoinc.com
EQUIPMENT DEVELOPMENT COMPANY
GETTING STARTED WITH YOUR NEW GRINDER
LOADING TOOLS:
Return level lock to the locked position.
LOADING TOOLS:
Lean back slightly on the handle to get the
tools off the surface and start the machine.
Lower the machine to the surface and do a
short touch pass on the concrete.
LEVELING:
You are looking for a complete circle.
LEVELING:
If you see a partial circle repeat the process
until complete circle is achieved.










