Installation Guide
Note:
For CS :
For CM :
A B
Ribbon Safety Gloves Safety Goggles Plier
Safety Shoes
Mulmeter
Screw Driver Crimping Modular
The following tools will be required to install CM(Master module) and CS(Slave module) .
B: Connect the grounding cable
1. Tools Required
2. Packing List
5. Wiring Steps
CM opera�on:
1. Normal mode:
2. Black start: When there is no PV and grid access,
press “POWER” buon, then press and
Startup steps:
Turn on DC switch and press the POWER switch
6. System Start Up
Quick Installa�on Guide
A B C D
E F G
H I J
A: Connect the inverter and make sure the
No. Items
A Mounng screw pack
B
Electric Drill Tape Marker
3. Terminals
For CS :
Handle
For CM :
CAN
Earth Terminal
Right
Handle
POWER Switch
DC Switch
Left
Handle
B
No.
Items No. Items
A
C
D
E
F
G
Mounng screw pack
Grounding cable
H
I
J
Footstand
Waterproof cover
Note: Inverter wiring refer to the inverter user manual.
DC OUT-
DC OUT+
BMS COM
Note:
Please make sure each system including 1 CM and 1 CS.CS less than pieces:
CS
CM
≤6 Layers
Step 5
Mark the wall through the bracket hole.
Step 6
with electric drill, make sure the holes
Step 3
Step 4
close to the wall and install them on
Insert
Step 1
Install a CS with four footstand (Item C )
and place it on the ground and adjust it
4. Installa�on Steps
Step 2
Insert the waterproof cover (Item J) into
300mm
300mm
20mm
20mm
place with the clip.
the wall.
LED
Step 7
Step 8
on the wall.
over.
press “POWER” buon.
Manual
Manual
K
K
must be installed
M
For outdoor use,please use item K and proceed as follows
Step 1: Prepare a standard network cable and cable connector, then insert the network
cable through the cable connector.
If the usage is indoor, please use item D
Please scan the QR Code and follow the steps below to download our
One snap on the left and right
Snaps face up
:
M
:
CS
CM
≤4 Layers
Note:
Please make sure each system including 1 CM and 1 CS.CS less than 4 pieces:
: