Instructions / Assembly
- SCREW THE FACE OUT INTO THE 
TOP UPRIGHT.
- SCREW THE LOWER UPRIGHT 
INTO THE TOP UPRIGHT.
NOTE:
 BE SURE THE CLEARANCE 
HOLE ON THE BOTTOM UPRIGHT 
IS CLOSE TO THE UNION ON THE 
TOP UPRIGHT.
FACE 
OUT
BOTTOM 
UPRIGHT
TOP 
UPRIGHT
CLEARANCE 
HOLE
UNION
- TO TIGHTEN THE UPRIGHT 
COMPONENTS TOGETHER, INSERT A 
SCREWDRIVER, OR SIMILAR TOOL, 
THROUGH THE CLEARANCE HOLE IN 
THE BOTTOM UPRIGHT.
- USING THE FACE OUT AND 
SCREWDRIVER FOR LEVERAGE, 
TIGHTEN THE UPRIGHTS TOGETHER 
AS MUCH AS POSSIBLE.
NOTE:
 THIS STEP MAY REQUIRE 2 
PEOPLE.
BASE
SET SCREW
- INSTALL THE CASTERS INTO THE 
PIPE BASE.
- SCREW THE ASSEMBLED UPRIGHT 
INTO THE BASE.
NOTE:
 MAKE THE UPRIGHT AS 
TIGHT AS POSSIBLE WHILE ALSO 
ALIGNING THE FACE OUT SO IT IS 
PARALLEL WITH THE BASE.
- INSTALL THE BASE SET SCREW AS 
SHOWN UNTIL IT IS TIGHT. 
ATTENTION
BEFORE BEGINNING ASSEMBLY, INSPECT THE 
BASE 3-WAY PIPE FITTING TO SEE IF THE UPRIGHT 
SET SCREW IS INSTALLED FROM THE FACTORY. IF 
IT IS, BE SURE TO UNSCREW IT AS FAR AS 
POSSIBLE, OR REMOVE IT. IF IT IS PACKED 
SEPARATELY, IGNORE THIS STEP.
2
SHEET 1 OF 1
PSC2
3
4
1

