Specifications
BOILER OPERATING CHECKLIST
a. Keep area around ECONOBURN™ boiler clean and clear of combustibles.
b. Use only wood. DO NOT burn any other combustible material, or liquid.
c. Remove ashes as directed.
d. Watch for soot in ue pipe - clean regularly.
e. Be aware of danger due to over ring unit.
f. This unit is NOT suitable for automatic stoking.
g. Load carefully.
DRAFT CONTROL FAN MUST BE STOPPED, AND FLUE DAMPER FULLY
OPENED FOR AT LEAST ONE MINUTE BEFORE OPENING THE LOADING
DOOR TO REFUEL.
This is necessary to ensure that smoke and ames from the re will not exit the loading door and
harm the operator.
h. Always observe the following minimum clearances to combustible materials:
Front 48”
Right side 18”
Left side and rear 24”
Flue pipe 18”
Floor must be non-combustible.
i. Maintain seals on ring door in good condition.
j. Establish a routine for storage of fuel, care of the appliance, and ring techniques.
23