User Manual
Table Of Contents
Patient Safeguard System® Patient Bed Installation
UltraClenz, LLC
Page 9
4.3 AC Line Power Sensor (ALP)
The AC Line Power Sensor (see Figure 6) is mounted onto the bed’s AC power cord (3” from cable gland). The ALP
Sensor senses the AC power of the patient bed cord to activate or deactivate the Bed Beacon during the bed’s
connect or disconnect, for transit to another location. The ALP Sensor is attached directly to the Dock via a small
cable. It mounts to bed’s power cord with 2 cable ties. Make sure a service loop is left in the ALP Sensor’s cable run,
allowing for the bed to be raised and lowered.
Figure 5. AC Line Power Sensor Attached to Power Cord
Cable Tie mounting
Mount the AC Line Power Sensor on the patient bed’s AC power cord using 2 cable ties (see Figure 5). Use cable tie
holders for routing the wire to the Dock, and make sure the mounting surface is clean and free of dirt and oil. A soft
cloth dampened with isopropyl alcohol works well to clean both surfaces.
4.4 Cable Management
1. Place cable tie holders, cable ties and route cable to the Bed Beacon as shown (see Figure 6, 7 & 8). Make sure
the mounting surfaces are clean and free of dirt and oil. A soft cloth dampened with isopropyl alcohol works well to
clean the mounting surfaces.
Figure 6. ALPS Cable Routing and Cable Tie Holder Placement
AC Line Power Sensor
attached to power cord
Service Loop (17”)