User Manual

Patient Safeguard System® Patient Bed Installation
UltraClenz, LLC
Page 22
1.4 Step 4: Adjusting the Bed Beacon to Proper Badge Range
1. Install 2 “D” cell alkaline batteries into the Bed Beacon and connect the Dock cable (CBL1033) (see Figure 4).
2. Set the Bed Beacon on the floor and temporarily connect cable (CBL1033) to the Dock (see Figure 4 & 5).
3. Connect the Bed Antenna and the AC Line Power Sensor as shown in Figure 5.
4. Plug the patient bed’s AC power cord into a 120vAC power source. This will activate the Bed Beacon so that
the range setting and all testing can be performed. Refer to section 5.0 for instructions on adjusting the
communication range.
Figure 4. Connecting the Bed Beacon to the
Dock
Bed Beacon Din connector
Bed Antenna connector
AC Line Power Sensor connector
Figure 5. Connecting the Bed Beacon to the
Dock
Head of the bed
Foot of the bed
Dock Din Cable CBL1033