User Manual

Patient Safeguard System® Patient Bed Installation
UltraClenz, LLC
Page 21
1.2 Step 2: Installing the Dock on the Bed
Tape mounting
Mount the Dock box under the bed on the left metal rail surface as shown with double-sided tape (supplied). Make
sure both the Dock and the mounting surface are clean and free of dirt and oil. A soft cloth dampened with
isopropyl alcohol works well to clean both surfaces. Firmly push and hold in place for several minutes (see Figure 2).
1.3 Step 3: Installing the AC Line Power Sensor on the bed’s AC Power Cord
The AC Line Power Sensor (see Figure 3) is physically mounted onto the bed’s AC power cord (3” from cable gland).
Use cable ties (supplied) and secure the AC Line power sensor to the bed’s power cord as shown. The ALP Sensor
detects the AC power of the bed’s cord to activate and deactivate the Bed Beacon.
Figure 2. The Dock Installation Location on the Bed
AC Line Power Sensor
attached to power cord
Head of the bed
Foot of the bed
Figure 3. The ALP Sensor Installation Location on the Bed