Installation Instructions

42
LED will flash green once. This will confirm that everything is working properly. Complete the installation by
following the instructions on metadata entry in section 7 Metadata Entry in the main section of this
document.
4. Bed Installation Checklist
Organize all required equipment & tools
1.
For installation adjust the bed mattress height to 32 inches
2.
For safetly reasons disconnect the bed AC power cord from 120vAC source
3.
Step 1
-
Bed Beacon Mode Configuration
4.
Step 2
-
Installing the Bed Beacon (
9205
3072
)
5.
Step 3
-
Install the AC Line Power Sensor (
9205
-
2186
)
6.
Step 4
-
Adjusting the Bed Beacon to Proper Field Range Refer to section 6
7.
Step 5
-
AC Line Power Sensor Cable Management
8.
Step 6
-
Final Test: Disconnect and
Reconnect the Bed’s AC Power Cord
9.
Step 7
-
Metadata Entry