Installation Instructions

41
1. Place cable tie holders, cable ties and route AC Line Power Sensor cable to the Bed Beacon as shown
(see Figure 5 & 6). Make sure the mounting surfaces are clean and free of dirt and oil. A soft cloth
dampened with isopropyl alcohol works well to clean mounting surfaces.
2. Place cable tie holders and route the AC Line Power Sensor cable on the bottom frame of the bed shown
in Figure 5 & 6.
3. Place cable tie holders, route and tie down any excess cable from the AC Line Power Sensor as
shown (see Figure 6). After all cable management is complete, use small wire cutters to carefully flush cut
off and dispose of all cable tie ends.
3. Step 6: Final Test
3.1 Disconnect and Reconnect the Bed’s AC Power Cord
Confirm that the bed’s AC power cord is connected into a 120vAC power source. Disconnect the bed’s AC
power cord and within 5 seconds you will hear one audio alert and the Bed Beacon LED will flash red once.
Reconnect the bed’s AC power cord and within 5 seconds you will hear one audio alert and the Bed Beacon
Figure 5.
AC Line Power
Sensor
Cable Routing to the
Bed Beacon
Figure 6.
AC Line Power Sensor
Cable Routing
Cable
Ties
Cable Tie
Holders
Head of the bed
Foot of the bed