Installation Instructions

28
6.
Step 4
-
Adjusting the Bed Beacon to Proper Field Range Refer
to section 6
7.
Step 5
-
AC Line Power
Sensor Cable Management
8.
Step 6
-
Final Test: Disconnect and Reconnect the Bed’s AC Power Cord
9.
Step 7
-
Metadata Entry
Appendix F - Patient Bed Hill-Rom 1000 & Advanta 2 Installation