Installation Instructions
13
Figure 8. AC Line Power Sensor Cable Routing and Cable Tie Holder Placement
2. Place cable tie holders and route the AC Line Power Sensor cable along the inside rail and tie down any
excess cable (service loop) as shown (see Figure 8).
Figure 9. AC Line Power Sensor Cable Routing and Cable Tie Holder Placement
3. Place a cable tie holder and route the AC Line Power Sensor cable as shown (see Figure 10).
Figure 10. AC Line Power Sensor Cable Routing to Bed Beacon and Cable Tie Holder Placement
Head of the bed
Foot of the bed
Head of the bed
Foot of the bed
Tie Downs
Patient Fall Detect
Sensor Path