3. Installation
DANGER!
Before installing EASYNET GATEWAY, turn off and disconnect the power supply to the ECOFOREST
device you intend to connect. Otherwise, severe injury may result from electrocution.
To install the EASYNET GATEWAY, follow the steps below:
1. Place the communication module inside the ECOFOREST device, in a dry place that does not interfere with the normal
operation of the device. To make sure that you install the GATEWAY in the right place, please refer to the manual of the
ECOFOREST equipment to which you intend to connect the GATEWAY.
2. Connect the bus communication cable to the EASYNET GATEWAY serial port as shown in the following figure.
3. Connect the bus communication cable to the BMS2 serial port of the ECOFOREST device controller, as shown in the
following figure.
Figure 3.1. Installation of the EASYNET GATEWAY to the ECOFOREST device.
4. Connect the antenna to the SMA connector of the EASYNET GATEWAY and place it outside of the ECOFOREST device in a
vertical position.
5. Check that the BMS2 port of the ECOFOREST device is set up as follows.
Protocol: MB Extended
Baud rate: 19200
Stop bits: 2
Parity: None
Address: See the table below.
UNIT
ADDRESS
Heat pump / Block supervisor
17
e-Manager / e-System
16
e-Source
15
Table 3.1. BMS2 communications bus addresses for the different ECOFOREST device.
BMS2
BUS COMMUNICATION CABLE
230 Vac
EASYNET
GATEWAY