Installation Guide
Table Of Contents
- Welcome
- Audience
- Related Documentation
- FCC Notice
- RF Statements
- EMC and Safety Statements
- 1. Introduction
- 2. Installing Components and Troubleshooting
- 3. Pole Mount Installation
- 4. Pad Mount Installation
- Introduction
- Required Tools
- Installation Location
- Preparing the Transformer Pad
- Preparing for Installation
- Performing the Installation
- Extend Pad Mounting Bracket
- Attach Pad Mounting Bracket to Lifting Nut
- Attach Conduit Housing to Pad Mounting Bracket
- Insert Conduit Thread into Conduit Housing
- Attach ECN to Pad Mounting Bracket
- Secure ECN to Pad Mounting Bracket
- Connect the ECN to Power and the Network
- Close and Lock the Conduit Housing
- Complete the Installation
- Verifying Successful Installation
- 5. Field Replacement for an ECN 7000 Series Device
- A. ECN 7000 Series Specifications
- B. Safety and High-Voltage Warnings
- C. ESD and Battery Warnings
40 Pad Mount Installation
Figure 17. Attach the Mounting Bracket to the Transformer’s Lifting Nut
Attach Conduit Housing to Pad Mounting Bracket
To protect the electrical and network connections to the ECN, the Pad Mounting
Bracket includes a Conduit Housing. The Conduit Housing is approximately 13
cm (5 inches) high and 30 cm (12 inches) wide. Attach the Conduit Housing to
the bottom of the upper extension of the Pad Mounting Bracket, as shown in
Figure 18 on page 41. You can perform this step prior to field installation.










