Installation Guide
Table Of Contents
- Welcome
- Audience
- Related Documentation
- FCC Notice
- RF Statements
- EMC and Safety Statements
- 1. Introduction
- 2. Installing Components and Troubleshooting
- 3. Pole Mount Installation
- 4. Pad Mount Installation
- Introduction
- Required Tools
- Installation Location
- Preparing the Transformer Pad
- Preparing for Installation
- Performing the Installation
- Extend Pad Mounting Bracket
- Attach Pad Mounting Bracket to Lifting Nut
- Attach Conduit Housing to Pad Mounting Bracket
- Insert Conduit Thread into Conduit Housing
- Attach ECN to Pad Mounting Bracket
- Secure ECN to Pad Mounting Bracket
- Connect the ECN to Power and the Network
- Close and Lock the Conduit Housing
- Complete the Installation
- Verifying Successful Installation
- 5. Field Replacement for an ECN 7000 Series Device
- A. ECN 7000 Series Specifications
- B. Safety and High-Voltage Warnings
- C. ESD and Battery Warnings
24 Installing Components and Troubleshooting
Make antenna connections using a suitable coaxial cable, and exit the shielding
as recommended. Routing for antenna cables must follow the requirements
described in your compliance approvals. The antennas must be installed as
directed using the mounting points provided.
Installing an Antenna
You can use the internal antenna holders for your own PCB antennas. Figure
11 shows the various antenna holders attached to the ECN inner card cage. The
holders are extremely flexible and allow antennas of various sizes to be mounted
on multiple planes.
Recommendations:
• Use the holders along each side for EV-DO, GPRS and ISM type
applications. In particular one holder can be used on each side for
diversity.
• Use the holders along the top of the card cage for Wi-Fi and Wi-Max
applications.
The holders also have built in clips that can be used for locating cabling and
holding protective ferrite beads.
Figure 11. Antenna Holder Locations










