Installation Guide
Table Of Contents
- Welcome
- Audience
- Related Documentation
- FCC Notice
- RF Statements
- EMC and Safety Statements
- 1. Introduction
- 2. Installing Components and Troubleshooting
- 3. Pole Mount Installation
- 4. Pad Mount Installation
- Introduction
- Required Tools
- Installation Location
- Preparing the Transformer Pad
- Preparing for Installation
- Performing the Installation
- Extend Pad Mounting Bracket
- Attach Pad Mounting Bracket to Lifting Nut
- Attach Conduit Housing to Pad Mounting Bracket
- Insert Conduit Thread into Conduit Housing
- Attach ECN to Pad Mounting Bracket
- Secure ECN to Pad Mounting Bracket
- Connect the ECN to Power and the Network
- Close and Lock the Conduit Housing
- Complete the Installation
- Verifying Successful Installation
- 5. Field Replacement for an ECN 7000 Series Device
- A. ECN 7000 Series Specifications
- B. Safety and High-Voltage Warnings
- C. ESD and Battery Warnings
ECN 7000 Series Hardware Guide 21
To remove the card cage, remove the screws at the four corners of the card cage,
as shown in Figure 9.
Figure 9. Top View of ECN with Cover Removed
Removing RF Shields
Prior to installing an expansion card in expansion slots 3, 4, or 5, you must
remove the factory-installed RF shielding for these slots. This shielding
protects the rest of the ECN electronics from unintended emissions from the
wireless or cellular modems installed in these slots.
Figure 10 on page 22 shows these slots with and without their RF shielding.










