46 Pad Mount Installation
Figure 23. Close and Lock the Conduit Housing
Complete the Installation
After the installation is complete, perform the following tasks:
1. Inspect the connection of the ECN to the Pad Mounting Bracket.
2. Inspect the connection of the Pad Mounting Bracket to the transformer.
3. Inspect the cabling connections to the ECN.
4. Inspect the transformer pad.
The completed installation should look similar to the views depicted in Figure
24 and Figure 25 on page 47. Note that the figures do not show the cabling
connections to the ECN.