Specifications

欧科华创自动化(深圳)有限公司
EC-LINK Automation (Shenzhen) Co. Ltd.
ADD:Room 2206, Block B, Shixia Xintian Century Business Center, Futian District, Shenzhen City
http://www.eclinksz.com Tel:0086-755-8368 1813 Fax:0086-755-8323 5833
E-mail:sales@eclinksz.com
4
4ANT1, ANT2, ANT3, ANT4 interface, SMA connector, connecting
antenna
Connect only the antennas you need to use. The antenna is not connected,
do not open the software, or the load may damage the reader!
3、Man-machine interface requirements:
Reading and writing host front has an LED display light, the specific definition
is as follows:
Lights
Definition
Led
Red light-indicates no data upload (no label read)
Led
Green light flashing-indicates data upload (reading label data)
Led
Blue light flashing-indicates software update in progress
NC
Levitation
GND
Power source