Specifications

TM 9-2330-384-14&P
Table 2-1. Operator Preventive Maintenance Checks and Services (PMCS) (Con't).
ITEM
3
NO.
2-12
B-Before
B
INTERVAL
D
A
W M
D-During
A-After
W-Weekly
ITEM TO BE INSPECTED
M-Monthly
PROCEDURE: Check for and have Repaired, Filled, or
Adjusted as required.
EQUIPMENT IS
NOT READY/
AVAILABLE IF:
ROADSIDE OF SEMITRAILER (Con't)
f. Check grounding stud (4) at cabinet for Any damage is found
looseness or damage. Clean any paint, grease,
that
will
prevent
or dirt on grounding contact surface. If loose or
proper grounding of
damaged, notify unit maintenance.
semitrailer.
g. Check that all Basic Issue Items (BII) in
cabinet are present (see Appendix C). Check
that two transfer hose reducers (18) are
present.
Transfer hose re-
ducers missing.
h. Check that grounding reels (16) in cabinet
are present and secured.
i.
Check that emergency valve control lever
(12) and vapor vent control lever (13) are
securely mounted to cabinet and are not
damaged.
Grounding reels are
damaged or missing.
Emergency valve or
vapor vent control
levers damaged.