Specifications
TM 9-2330-384-14&P
5-8. VAPOR INTEGRITY TEST (Con't).
(2)
Make sure shutoff valve (16), valve (19), draincock valve (20), and two valves (28 and 27) are closed and two
valves (14 and 26) are open.
8@
26
0
0
28
0
27
(3)
Set two valves (17 and 22) for reading vacuum.
17
VALVE POSITION
22
FOR READING
VACUUM
fVA
L
VALVE POSITIONFOR
FC
READING VACUUM
Change1
5-37










