Specifications
TM 9-2330-384-14&P
5-8. VAPOR INTEGRITY TEST (Con't).
WARNING
Return tank and discharge piping system to atmospheric pressure. Failure to do so
may result in injury to personnel or damage to equipment.
(31)
Open draincock valve (20) and return tank and discharge piping system to atmospheric pressure.
20
C.
VACUUM TEST PREPARATION
NOTE
Visually inspect outside of tank and all associated piping. Look for stained areas that
indicate obvious leakage. Repair obvious leak areas prior to leak testing.
(1)
Close butterfly valve (1) and rear sump drain (2).
1
C2)
5-36
Change1










