Specifications

TM 9-2330-384-14&P
4-81. VAPOR VENT REPLACEMENT.
a.
Removal
b.
Installation
Equipment Conditions:
Ref
Conditions
4-68 Tank purged.
Materials/Parts:
l One gasket
Tools:
l Tool kit, general mechanic’s
a. REMOVAL
(1)
(2)
(3)
(4)
(5)
(6)
Loosen clamp (4) and disconnect
vent hose (5) from vapor vent
(1).
Loosen nut (8) and nut (10).
Remove four nuts (2) and wash-
ers (3). Remove vapor vent (1)
from mounting flange.
Pull vapor vent (1) away from ca-
ble (7) and remove.
Remove gasket and discard.
Remove straight adapter (9) from
vapor vent (1).
b. INSTALLATION
(1) Install new gasket to mounting
flange of vapor vent (1).
(2)
Install straight adapter (9) to va-
por vent (1).
(3)
Position vapor vent (1) at mounting flange, threading cable (7) through straight adapter (9)
and vapor vent. At vapor vent, ensure that cable is positioned between two washers (6).
(4)
Take up slack in cable (7) and tighten nuts (8 and 10).
(5)
Install four washers (3) and nuts (2).
(6)
Connect vent hose (5) to vapor vent (1) and tighten clamp (4),
FOLLOW-ON TASKS:
l Check operation of vapor vent (see paragraph 2-2).
l Adjust cable length at vapor vent or in cabinet, as required (see paragraph 4-74).
4-266