Specifications
TM 9-2330-384-14&P
LOCATION AND CONTENTS OF PLATES (Con't).
0
OVERFLOW SENSOR
0
PRECH
1.
READ THE SEMITRAILER TECHNICAL MANUAL
(TM 9-2330-394-14&P) BEFORE ATTEMPTING TO
USE THE PRECHECK.
2.
WHILE BOTTOM LOADING THE TANK OBSERVE
PRESSURE GAUGE READING, AND THEN OPEN
THE PRECHECK BALL VALVE.
3.
THE OVERFLOW SENSOR IS OPERATING PROPER-
LY. IF THE EMERGENCY VALVE CLOSES WITHIN
2 MINUTES AFTER THE PRECHECX VALVE IS
OPENED,. THIS WILL STOP THE FLOW OF FUEL
INTO T
HE TANK, AS INDICATED BY A SUDDEN
INCREASE IN THE PRESSURE GAUGE READING.
TO RESUME LOADING. CLOSE THE PRECHECK
BALL VALVE.
4.
IF THE EMERGENCY VALVE DOES NOT CLOSE
WITHIN 2 MINUTES, STOP LOADING FUEL AND
CONSULT THE SEMITRAILER TECHNICAL MANU-
AL TROUBLESHOOTING INSTRUCTIONS.
PRESSURE
QAI pnF
TURING (TYPI
HANDLE IN OPEN
POSITION
HANDLE IN CLOSED
PRFQHrCK
POSITION
RAI i VAt VP
3
ME
0
lk
0
TKG5560-1 0
1-17










